Hello! Welcome to our construction update page. We have been undergoing a lot of work in the competition pool. As you can see by the pictures below it is going well and moving along.
First we had a soil stabilizer injected along the outside wall of the competition pool. This will help keep outside water away from the competition pool shell and out of the timing system. Being the lowest point on campus we get a lot of water trickling this way, but we don’t need any extra in or around the pool!
After the injections were completed and cured we started de-chlorinating the water and draining on July 9th!
Once all the water had been drained, the far wall tile being removed to continue repairs. It’s exciting stuff at the AFC!
The tile is pretty much gone! The mud wall is going up so that tiling can soon begin!
Tiling is flying by! These guys are putting in long hours to help us meet out deadline! Tiling and grouting are expected to be finished today August 4th!
The team is also prepping our timing system component areas with fresh tiling as well for Colorado Time Systems to replace all of the deck plates!
Up next: valve replacement for the surge pit and timing system replacement!